检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡浩然 廖峻[1] 胡青平 王坤 HU Haoran;LIAO Jun;HU Qingping;WANG Kun(China Merchants Chongqing Communications Technology Research&Design Institute Co.,Ltd.,Chongqing 400067)
机构地区:[1]招商局重庆交通科研设计院有限公司,重庆400067
出 处:《公路交通技术》2024年第3期141-150,共10页Technology of Highway and Transport
摘 要:周边超前预注浆加固是改变裂隙岩体物理力学性能和渗透性能的有效方法,以鸡心岭隧道工程为例,通过数值模拟分析了周边预注浆加固前后、不同注浆圈厚度和注浆圈渗透系数对围岩渗流场、位移场、塑性区及支护受力的影响规律。结果表明:1)周边超前预注浆加固能有效降低初期支护静水压力,减小围岩塑性破坏范围和洞周位移,并使得隧道涌水集中发生在拱脚位置;2)注浆圈厚度超过8 m后,继续增大注浆圈厚度对围岩位移的影响较小;3)降低注浆圈渗透系数可有效降低隧道涌水量,但会增大围岩变形。Perimeter pre-grouting reinforcement is an effective method to change the physical and mechanical properties and permeability properties of fractured rock mass.In this paper,Jixinling tunnel is taken as an example,the influence of pre-grouting reinforcement before and after the full-section pre-grouting reinforcement,different thicknesses of grouting circle and permeability coefficients of grouting circle on the peripheral rock seepage field,displacement field,plastic zone and the support stress are analyzed by numerical simulation.The results show that:1)the full-section pre-grouting reinforcement can effectively reduce the hydrostatic pressure of the initial support,reduce the scope of peripheral rock plastic damage and peripheral displacement,and make the tunnel water influx concentrated in the foot of the tunnel;2)After the thickness of the grouting ring exceeds 8m,the influence of increasing the thickness of the grouting ring on the peripheral displacement of the surrounding rock is relatively small;3)Reducing the permeability coefficient of the grouting ring can effectively reduce the water influx in the tunnel,but it will increase the deformation of the surrounding rock.
分 类 号:U457[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248