酒钢1#2#焦炉动力煤输送绿色智能化改造系统开发与实施  

Development and Implementation of Green Intelligent TransformationSystem for Power Coal Transportation in JISCO 1# and 2# Coking Ovens

在线阅读下载全文

作  者:陈治州[1] 李春伟 Chen Zhizhou;Li Chunwei(Maintenance Engineering Department of Hongxing Iron&Steel Co.Ltd.,Jiuquan Iron and Steel(Group)Corporation,Jiayuguan,Gansu,735100)

机构地区:[1]酒钢集团宏兴股份公司检修工程部,甘肃嘉峪关735100

出  处:《酒钢科技》2024年第2期63-68,共6页

摘  要:储运部动力煤料场改造项目是本部1#2#焦炉优化升级建设配套项目改造分项,主要从工艺上新增供料线、卸料线、3#~5#胶带机提速改造及配套环保控制系统,并对部分老料线进行了改造。工艺复杂、通信系统程序量大、参与联锁的设备较多是此项目实施的难点。The renovation project of the Power Coal Material Yard of the Storage and Transportation Department is a sub project of the optimization and upgrading construction of the 1#and 2#coke ovens in our department.It mainly includes the addition of feeding and unloading lines in the process,the acceleration renovation of the 3#~5#belt conveyor,and the supporting environmental protection control system.Some old material lines have also been renovated.The difficulties in implementing this project include complex processes,large amounts of communication system programs,and a large number of equipment involved in interlocking.

关 键 词:自动化 供料线 卸料线 胶带机 

分 类 号:TQ5[化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象