作 者:林武星 Lin Wuxing(Fuzhou Jiangyin Industrial Zone Development and Construction Co.,Ltd.,Fuzhou Fujian 350309,China)
机构地区:[1]福州市江阴工业区开发建设有限公司,福建福州350309
出 处:《山西建筑》2024年第15期73-76,共4页Shanxi Architecture
摘 要:以福州江阴电力管廊隧道项目为例,针对长距离紧邻的大直径原水管的保护,介绍深基坑工程的实施方案,重点说明所采取的拉森钢板桩和外侧增加H型钢的围护体结构,竖向设置两道钢管水平支撑和坑底进行旋喷桩被动区加固等关键技术方案。监测结果表明,在基坑开挖和换撑过程中引起的管线位移限值均在可控范围内,采用的设计方案是合理有效的。This article takes the Fuzhou Jiangyin electric cable tunnel project as an example,and introduces the overall design scheme of the deep foundation pit project for the protection of long-distance and adjacent large-diameter raw water supply pipes.Key technologies such as Larsen steel sheet piles with an outer H-shaped steel enclosure structure,vertical installation of two steel pipes for horizontal support,and passive zone reinforcement of rotary jet grouting piles at the bottom of the pit are emphasized.The monitoring results indicate that the pipeline displacement values caused during excavation and support replacement of the foundation pit are within the control range,and the adopted design scheme is reasonable and effective.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.138.59