检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郄聃 万海洋 张桐菲 孙晓光 王志强[1] 刘文霞[1] QIE Dan;WAN Haiyang;ZHANG Tongfei;SUN Xiaoguang;WANG Zhiqiang;LIU Wenxia(School of Electrical and Electronic Engineering,North China Electric Power University,Beijing 102206,China;Changchun Power Supply Company of State Grid Jilin Electric Power Co.,Ltd.,Changchun 130021,China)
机构地区:[1]华北电力大学电气与电子工程学院,北京市102206 [2]国网吉林省电力有限公司长春供电公司,吉林省长春市130021
出 处:《电力系统自动化》2024年第13期120-129,共10页Automation of Electric Power Systems
基 金:国家自然科学基金资助项目(52307094);国网吉林省电力有限公司科技项目(基于内网云及i国网的应急辅助决策系统研发与应用,2022-04)的支持.
摘 要:为提高灾前、灾后电力抢修物资与抢修人员调度的协调性和鲁棒性,提出一种计及故障信息和物资需求双重不确定的灾前电力抢修物资预布局与灾后协同调度策略。首先,灾前针对灾情预测信息和电力抢修物资的双重不确定性,考虑决策者对风险的偏好程度,建立基于均值-条件风险价值(CVaR)的双层物资调配分布鲁棒优化(DRO)模型,上层以电力抢修物资配置成本最小为目标对物资中转点的选择及预置电力抢修物资的数量进行优化,下层基于均值-CVaR工具搜索最恶劣故障场景分布,并鲁棒优化(RO)故障场景下中转点到故障点的电力抢修物资分配策略,以求得故障损失成本;其次,灾后考虑物资和抢修人员调度的时序耦合约束,建立以停电损失最小为目标,中转点分配至各故障点物资的种类及数量和抢修人员的调度计划为决策变量的混合整数线性规划模型;最后,通过118节点实际配电网系统进行仿真分析,验证了所提方法的有效性。In order to improve the coordination and robustness of pre-disaster and post-disaster power repair materials and repair crew scheduling,a pre-disaster pre-layout and post-disaster collaborative scheduling strategy for power repair materials considering the dual uncertainties of fault information and material demand is proposed.Firstly,in view of the dual uncertainties of pre-disaster forecasting information and power repair material,considering the degree of risk preference of decision makers,a distributed robust optimization(DRO)model of two-layer material allocation distribution based on the mean-conditional value-at-risk(CVaR)is established.The upper layer optimizes the selection of material transfer points and the number of preset power repair materials with the goal of minimizing the cost of power repair material allocation.The lower layer searches for the worst fault scenario distribution based on the mean-CVaR tool,and robust optimizes the power repair material allocation strategy from the transfer point to the fault point in the fault scenario to obtain the fault loss cost.Secondly,considering the post-disaster time series coupling constraints of material and repair crew scheduling,a mixed-integer linear programming model is established with the goal of minimizing the outage loss,the type and number of materials allocate to each fault point from the transfer point and the repair crew scheduling as decision variables.Finally,through the simulation analysis of the actual 118-bus distribution network,the effectiveness of the proposed strategy is verified.
关 键 词:配电网 故障抢修 电力抢修物资 分布鲁棒优化(DRO) 均值-条件风险价值(CVaR)
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200