检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟洁 周振永 刘莎莎[1] 沈静 ZHONG Jie;ZHOU Zhenyong;LIU Shasha;SHEN Jing(No.4 Oil Production Plant,PetroChina Huabei Oilfield Company,Langfang,Hebei 065300,China)
机构地区:[1]中国石油天然气股份有限公司华北油田分公司第四采油厂,河北廊坊065300
出 处:《江汉石油职工大学学报》2024年第3期14-16,共3页Journal of Jianghan Petroleum University of Staff and Workers
摘 要:为提高J11断块高采出程度、特高含水“双高”砂岩油藏采收率,通过对该油藏开发情况的定位和油藏地质模型的精雕细刻,构建剩余油分布类型,分级描述水淹程度,分析控制剩余油分布的地质因素及水淹规律,提出剩余油的分布类型,从而确定J11油藏二次开发的“二三结合”技术策略,给出了不同类型剩余油的挖潜方法和开发方式,打通进入双高油藏开发后期的新出路。In order to improve the recovery rate of sandstone reservoirs with high depletion and high water cut in the J11 fault block,a comprehensive approach was adopted.Firstly,the development status of the reservoir was assessed,and a refined geological model of the reservoir was established.Then,the distribution types of remaining oil were identified,and the degree of water flooding was evaluated.Subsequently,the geological factors controlling the distribution of remaining oil and the patterns governing water flooding were analyzed.Based on these analyses,the distribution types of remaining oil were determined.Finally,a“Combination of Two and Three”technical strategy was proposed for the secondary development of the J11 reservoirs.This strategy provides tailored methods and development models for tapping different types of remaining oil,opening up new pathways for the late-stage development of reservoirs with high depletion and high water cut.
分 类 号:TE357[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.203.108