检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋隆建 JIANG Longjian
机构地区:[1]福州市城乡规划设计院有限公司,福建福州350007
出 处:《城市道桥与防洪》2024年第6期66-69,共4页Urban Roads Bridges & Flood Control
摘 要:现行规范要求非机动车道的最大纵坡不超过3.5%,但要在山地城市、跨江桥梁两岸慢行系统衔接等场景下满足该要求存在工程占地大、造价高、可实施性差等问题,考虑到电动自行车在非机动车出行方式中占比越来越高的实际情况,以《电动自行车安全技术规范》(GB 17761-2018)规定的国标电动自行车为研究对象对骑行过程进行受力分析,提出了可满足电动自行车骑行要求的非机动车道最大纵坡参考值,可供电动车骑行占比高的类似项目参考。The current regulations require that the maximum longitudinal slope of non-motorized vehicle lanes should not exceed 3.5%.However,there are problems to meet this requirement in the scenarios such as the mountainous cities and the connection of slow traffic systems on both banks of cross-river bridges because of large engineering land occupation,high cost and poor feasibility.Considering the increasing proportion of electric bicycles in non-motorized vehicle traffic,taking the national standard electric bicycles specified in the Technical Specification for Safety of Electric Bicycles(GB 17761-2018)as the research object,the force analysis during the riding process is carried out,and a reference value for the maximum longitudinal slope of non-motorized vehicle lanes that can meet the requirements of electric bicycle riding is proposed,which can be used as a reference for similar projects with a high proportion of electric bicycle riding.
分 类 号:U412.37[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49