检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程贵华 CHENG Guihua(Tongji Architectural Design(Group)Co.,Ltd.,Shanghai 200092,China)
机构地区:[1]同济大学建筑设计研究院(集团)有限公司,上海市200092
出 处:《建筑电气》2024年第6期9-15,共7页Building Electricity
摘 要:结合参与设计的某三级甲等医院项目,总结医疗建筑中手术室和重症监护病房(ICU)供配电系统设计要点,包括UPS设置方案的选择、局部IT系统设计、手术室专用配电箱容量确定、手术部工艺设备的供配电、ICU床位设备带容量确定、净化空调供配电系统设计等。Combined with the participation in the design of a Grade IIl Level A hospital project,the key points of power supply and distribution system design for operating rooms and Intensive Care Units(ICU)in medical buildings are summarized,including the selection of UPS setup scheme,local IT system design,capacity determination of the special distribution box for the operating room,supply and distribution of process equipment in the operating department,determination of the capacity for ICU medical bedhead units,and the design of the power supply and distribution system for the purifying air conditioner.
关 键 词:局部IT系统 手术室 供电可靠性 重症监护病房(ICU) 数字减影血管造影(DSA) 双重电源 不间断电源装置(UPS) 专用配电箱
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7