检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵晶晶 董海军[1] 马琼丽 ZHAO Jing-jing;DONG Hai-jun;MA Qiong-li(Yulin Chemical Co Ltd,Lanzhou Petrochemical Company,PetroChina,Yulin 719000,China)
机构地区:[1]中国石油兰州石化公司榆林化工有限公司,陕西榆林719000
出 处:《石化技术与应用》2024年第3期212-215,共4页Petrochemical Technology & Application
摘 要:对中国石油兰州石化公司榆林化工有限公司40万t/a高密度聚乙烯装置流化床出现分布板筛孔堵塞、通道粉料堆积、加热板粉料挂壁严重等问题造成流化床运行周期短的原因进行了分析,并采取了相应的优化措施。结果表明:上述问题是由聚合反应系统产生块状树脂,流化床进、出料流量波动大,通道设计缺陷以及循环N_(2)风机设计功率偏小等因素引起的;通过采取优化聚合反应、离心机、流化床等系统操作,消除气力输送系统运行故障等措施,将乙烯进料量由18~45 t/h提高到52 t/h,流化床1腔床层压差由5.5 kPa降低至4.5 kPa,流化床运行周期由90 d延长至288 d。The reasons for the short operating cycle of the fluidized bed in the 4×105 t/a high density polyethylene plant of Yulin Chemical Co Ltd of Lanzhou Petrochemical Company of PetroChina which were caused by the problems such as the blockages of the distribution plate sieve holes,the accumulation of channel powder,and the powder severely hanging on the heating plate were analyzed,and the corresponding optimization measures were taken.The results showed that the above problems were caused by the factors such as the blocky resin produced by the polymerization reaction system,the large fluctuations of the inlet and outlet flow of the fluidized bed,the defects of the channel design,and the small design power of the circulating N_(2) fans.By optimizing the operation of the polymerization reaction,centrifuge,fluidized bed and other systems,and eliminating the operation faults of the pneumatic conveying system,the ethylene inlet amount was increased from 18-45 t/h to 52 t/h,the bed pressure difference of fluidized bed 1 chamber was reduced from 5.5 kPa to 4.5 kPa,and the operation cycle of fluidized bed was extended from 90 d to 288 d.
关 键 词:聚乙烯 高密度聚乙烯 流化床 运行周期 分布板 离心机 循环风机 床层压差
分 类 号:TQ325.12[化学工程—合成树脂塑料工业]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229