检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李雪松 姬付全[1,2,3] 杨钊 陈培帅[1,2,3] 杨睿 LI Xue-song;JI Fu-quan;YANG Zhao;CHEN Pei-shuai;YANG Rui(CCCC Second Harbour Engineering Company Ltd.,Wuhan 430040,China;Key Laboratory of Large-span Bridge Construction Technology,Wuhan 430040,China;Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure,Wuhan 430040,China)
机构地区:[1]中交第二航务工程局有限公司,武汉市430040 [2]长大桥梁建设施工技术交通行业重点实验室,武汉市430040 [3]交通运输行业交通基础设施智能制造技术研发中心,武汉市430040
出 处:《公路》2024年第6期116-121,共6页Highway
摘 要:为实现水下混凝土浇筑标高的自动连续测量,基于测锤探头进入泥浆、浮浆及混凝土3种不同介质中的阻力差异,集成电机驱动系统、计米器、压力传感、PLC及测锤探头运动算法,研发水下混凝土浇筑标高自动监测装置。测锤探头实时反馈阻力值,并根据设定的压力控制阈值自动控制测锤探头动作;计米器实时显示当前标高监测结果。自动监测装置经过两代产品迭代,分别在武汉双柳大桥项目及广州狮子洋通道工程中应用。标高监测结果与浇筑量换算标高及人工测量结果的对比表明,第一代产品由于动作简单,自动测量模式下易被埋入混凝土,导致结果不准确;而第二代产品提高了智能化程度,测量结果与人工测量结果和浇筑量换算结果接近,且较人工测量结果更稳定。In order to realize automatic and continuous measurement of underwater concrete pouring elevation,an automatic monitoring device for underwater concrete pouring elevation is developed based on the difference of resistance of the hammer probe into three different media,namely mud,floating slurry and concrete,which integrating motor drive system,meter counter,pressure sensor,PLC and the motion algorithm of the hammer probe.The measuring hammer probe feeds back the resistance value in real time,and automatically controls the action of the measuring hammer probe according to the set pressure control threshold.The meter counter displays the current elevation monitoring result in real time.After two generations of product iteration,the automatic monitoring device is applied in Wuhan Shuangliu Bridge project and Guangzhou Shiziyang Passage project respectively.The elevation monitoring results are compared with the conversion elevation of pouring volume and manual measurement results.The result of the first generation product is inaccurate due to its simple action and easy to be buried in concrete under the automatic measurement mode.The second generation of products has improved the degree of intelligence,and the measurement results are close to the manual measurement results and the conversion results of poured volume,which is more stable than the manual measurement results.
关 键 词:桥梁工程 水下混凝土 浇筑标高 自动监测装置 智能化 技术研究
分 类 号:U446.2[建筑科学—桥梁与隧道工程] U445.57[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7