检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:资谊[1] 姜浩[2] 梁晓明 陈稳 张忆 吴鑫林 ZI Yi;JIANG Hao;LIANG Xiao-ming;CHEN Wen;ZHANG Yi;WU Xin-Lin(China Railway Siyuan Survey and Design Group Co.Ltd.,Wuhan 430063,China;Key Laboratory of Transportation Tunnel Engineering,Ministry of Education,Southwest Jiaotong University,Chengdu 610031,China;Jiangsu Traffic Engineering Construction Bureau,Nanjing 210004,China)
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉市430063 [2]西南交通大学交通隧道工程教育部重点实验室,成都市610031 [3]江苏省交通工程建设局,南京市210004
出 处:《公路》2024年第6期354-360,共7页Highway
基 金:国家自然科学基金项目,项目编号52078430。
摘 要:依托江阴靖江长江隧道工程,结合整环原型试验和三维精细化数值模拟,研究了水土压对超大直径通缝管片接缝变形的影响规律。结果表明:当封顶块位于拱顶时,管片接缝的最大变形、最大张开量分别位于拱顶外侧与内侧接缝;管片外侧接缝变形随水压增大而增大,而管片内侧接缝闭合速度随水压增大而减小;随着土压的逐渐增大,管片内侧接缝始终先于外侧接缝张开;当土压与水压之比小于0.5时,拱顶和拱底内侧接缝始终处于张开状态;当土压与水压之比大于3时,拱肩和拱脚外侧接缝始终处于张开状态;当两者的比值大于4时,拱腰外侧接缝始终处于张开状态。Based on the Jiangyin Jingjiang Yangtze River Tunnel Project,combined with the whole ring prototype test and three-dimensional refined numerical simulation,the deformation law of water and soil pressure on the joints of super-large diameter through-seam segments are explored in the paper.The results show that when the capping block is located at the vault,the maximum deformation and maximum opening of the segment joint are located at the outer and inner joints of the vault,respectively;the deformation of the outer joint of the segment increases with the increase of water pressure,while the closure speed of the inner joint of the segment decreases with the increase of water pressure;with the gradual increase of earth pressure,the inner joint of the segment is always opened before the outer joint;when the ratio of earth pressure to water pressure is less than 0.5,the inner joint of vault and arch bottom is always in an open state;when the ratio of earth pressure to water pressure is greater than 3,the outer joint of arch shoulder and arch foot is always open;when the ratio of the two is greater than 4,the lateral joint of the arch waist is always in an open state.
关 键 词:公路隧道 盾构法 管片接缝 高水压 大埋深 数值模拟 原型试验
分 类 号:U455.43[建筑科学—桥梁与隧道工程] U455.46[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117