作 者:鞠智敏 JU Zhimin(Power China Zhongnan Engineering Corporation Limited,Changsha 410014,China)
机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014
出 处:《云南水力发电》2024年第7期67-71,共5页Yunnan Water Power
摘 要:某大型水电站导流洞进口闸室结构为一个典型的三维受力结构,特别是封堵期作用于闸门上的最大水头达到120m,水推力大。为了保证导流洞进水口闸室结构在复杂受力情况下的安全可靠性,建立闸室整体有限元模型,并参考类似工程相关计算,主要对该导流洞进口闸室结构在完建期、运行期和封堵期3种工况进行三维计算分析。The inlet lock chamber structure of a large hydropower station diversion tunnel is a typical three-dimensional stress structure.The maximum water head acting on the gate during the sealing period reaches 120m,with a high hydraulic thrust.In order to ensure the safety and reliability of the intake lock chamber structure of the diversion tunnel under complex stress conditions,this paper establishes an overall finite element model of lock chamber.And referring to similar engineering calculations,it conducts three-dimensional calculation analysis on the inlet lock chamber structure of the diversion tunnel under three working conditions:completion period,operation period,and sealing period.
分 类 号:TV314[水利工程—水工结构工程] TV551.12
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.12