延迟焦化装置加热炉铬钼合金钢管道焊接技术分析  

在线阅读下载全文

作  者:黄伟 

机构地区:[1]中国石油集团工程材料研究院有限公司,西安710077 [2]北京隆盛泰科石油管科技有限公司,北京100101

出  处:《科技创新与应用》2024年第21期173-176,共4页Technology Innovation and Application

摘  要:延迟焦化装置可以将石油焦去除,同时符合节能环保的工作理念,因此当前在石油化工行业广泛利用延迟焦化装置。因为延迟焦化装置加热炉处于高温和高压的环境中,再加上材料自身特征的影响,因此在铬钼合金钢管道中经常会出现裂纹等问题,影响到设备运行的稳定性。因此,需要加强研究延迟焦化装置加热炉铬钼合金钢管道焊接技术,针对当前存在的问题提出针对性改进措施,对于实际工作起到参考作用。Delayed coking unit can remove petroleum coke and conforms to the working concept of energy saving and environmental protection,so delayed coking unit is widely used in petrochemical industry.Because the heating furnace of delayed coking unit is in the environment of high temperature and high pressure,coupled with the influence of material characteristics,cracks and other problems often occur in chromium-molybdenum alloy steel pipe,which affect the stability of equipment operation.Therefore,it is necessary to strengthen the research on the welding technology of chromium-molybdenum alloy steel pipe in the reheating furnace of delayed coking unit,and put forward corresponding improvement measures in view of the existing problems,which can be used as a reference for practical work.

关 键 词:延迟焦化装置 加热炉 铬钼合金钢管道 焊接技术 焊接程序 

分 类 号:V445[航空宇航科学与技术—飞行器设计]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象