水电站水锤模拟计算及导叶关闭规律优化  

Simulation Calculation of Water Hammer in Hydropower Station and Optimization of Guide Vane Closing Rules

在线阅读下载全文

作  者:张芷豪 于奎[1] 王经纬 Zhang Zhihao;Yu Kui;Wang Jingwei(School of Water Resource and Electric Power,Heilongjiang University,Harbin 150080,Heilongjiang)

机构地区:[1]黑龙江大学水利电力学院,黑龙江哈尔滨150080

出  处:《陕西水利》2024年第7期5-8,共4页Shaanxi Water Resources

摘  要:水电站运行过程中,为了降低因机组甩负荷使得导叶关闭而引起的管道压力上升值和转速上升值,通常会采取许多措施,其中常用的措施就是控制机组导叶关闭规律。以塔林西水电站为例,用Hammer软件对水电站进行调节保证计算,对于不同的导叶关闭规律,选取最合理有效的导叶关闭方案,并且模拟导水叶开启时尾水管处的压力情况,确定导水叶开启的最短时间。During the operation of hydropower station,in order to reduce the increase of pipeline pressure and speed caused by the closure of guide vane due to load rejection,many measures are usually taken,among which the common measure is to control the closure rule of guide vane.Taking Talinxi Hydropower Station as an example,Hammer software is used to carry out the adjustment guarantee calculation of hydropower station,and the most reasonable and effective guide vane closing scheme is selected for different guide vane closing laws.And simulate the pressure at the tail pipe when the water guide blade is opened to determine the shortest opening time of the water guide blade.

关 键 词:水电站 水锤 导叶关闭规律 

分 类 号:TV734[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象