检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘楷操 李佳佩 Liu Kaicao;Li Jiapei(Zhuhai Institute of Urban Planing&Design,Zhuhai 519000,Guangdong)
出 处:《陕西水利》2024年第7期58-61,64,共5页Shaanxi Water Resources
摘 要:交错布置的涉河设施普遍阻水比较大,影响河道行洪。但国内涉及交错布置阻水设施对河道水流内部水力特性影响的研究相对较少。采用一维、二维水力模型联合应用的方式进行河道内交错布置阻水设施对洪水演进的影响研究,分析桥墩对河道行洪的流态改变、壅水程度,并针对性地提出工程补救方案,保障区域的行洪安全。该研究成果不仅能够为工程设计提供有利的水力条件支撑,还可为后续类似工程提供理论经验。The staggered river crossing facilities generally block the water and affect the flood flow.However,there are relatively few studies on the influence of staggered water blocking facilities on the internal hydraulic characteristics of river flow in China.The influence of staggered arrangement of water blocking facilities on flood evolution was studied by the combined application of one-dimensional and two-dimensional hydraulic models.The change of flow pattern and degree of backwater caused by bridge piers were analyzed,and the engineering remedy scheme was put forward to ensure the flood safety of the region.The research results can not only provide favorable hydraulic conditions for engineering design,but also provide theoretical experience for subsequent similar projects.
关 键 词:水力学及河流动力学 绕流流场分析 二维数学模型 交错布置阻水设施
分 类 号:U447[建筑科学—桥梁与隧道工程] TV122[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7