作 者:刘泽戈 LIU Ze-ge(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou 510635,China)
机构地区:[1]广东省水利电力勘测设计研究院有限公司,广州510635
出 处:《广东水利电力职业技术学院学报》2024年第3期14-17,100,共5页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
摘 要:乐昌峡水利枢纽右岸防汛道路受强降雨影响,边坡多次出现塌方,导致原有村道中断、乐昌峡右岸公路通行受阻。对此,在调查并掌握水文地质状况的基础上,提出边坡开挖卸载、边坡局部卸载+支护以及利用隧道改线三种处理方案。经综合比较分析,推荐边坡局部卸载+支护作为实施方案。该设计经验可为类似工程提供参考。Affected by heavy rainfall,the flood control road on the right bank of the Lechang Gorge Hydrojunction has experienced multiple slope collapses,leading to the interruption of the original village road and blockage of traffic on the right bank highway of the Lechang Gorge.In response,based on investigation and understanding of hydrogeological conditions,three treatment plans are proposed,namely,slope excavation and unloading,partial unloading of slopes with support,and utilizing tunnel realignment.After comprehensive comparative analysis,it is recommended to implement the plan of partial unloading of slopes with support.The design experience can serve as a reference for similar projects.
分 类 号:U418.52[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49