检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王庆琦 WANG Qingqi
机构地区:[1]山西华阳集团新能股份有限公司供电运维管理中心,山西阳泉045000
出 处:《电力系统装备》2024年第6期109-111,共3页Electric Power System Equipment
摘 要:华阳矿区电网担负着华阳新材料科技集团有限公司本部主要矿井的安全供电,且许多矿井存在煤与瓦斯突出矿井问题,极具危险性。电网停电易造成矿井停风、水灾、设备紧急制动、设备停电等事故,严重威胁矿井安全生产。对华阳矿区电网的运行状况进行深入分析,对电网现有的保护措施进行深入研究,找出电网的缺陷和薄弱环节,对影响电网安全稳定运行的缺陷和问题进行及时整改,以提升设备的安全性能,对确保供电系统安全、稳定运行具有重要意义。The power grid of Huayang Mining area is responsible for the safe power supply of the main mines of Huayang Group,and there are coal and gas outburst problems in many mines,which is extremely dangerous.Power grid power outage is easy to cause mine wind shutdown,flood,equipment emergency braking,equipment power outage and other accidents,which seriously threaten the safety of mine production.It is of great significance to conduct an in-depth analysis of the operation status of the power grid in Huayang Mining area,conduct an in-depth study on the existing protection measures of the power grid,find out the defects and weak links of the power grid,and timely rectify the defects and problems affecting the safe and stable operation of the power grid,so as to improve the safety performance of the equipment,and ensure the safe and stable operation of the power supply system.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.115.135