作 者:周莹莹 田博 田哲 向峥 裴凌旭 ZHOU Yingying;TIAN Bo;TIAN Zhe;XIANG Zheng;PEI Lingxu(Tianjin Cement Industry Design&Research Institute Co.,Ltd.,Tianjin 300400,China;Sinoma Cement Co.,Ltd.,Beijing 100044,China)
机构地区:[1]天津水泥工业设计研究院有限公司,天津300400 [2]中材水泥有限责任公司,北京100044
出 处:《水泥技术》2024年第4期62-64,69,共4页Cement Technology
摘 要:对比了多种清洁能源发电方式在水泥厂应用的优缺点,介绍了光伏发电方式光伏板的布置、单晶硅太阳能电池组件的应用及并网方式,容量为9.2MW的光伏发电系统,测算25年寿命期内年平均发电量9504MW·h;余热电站发电方式取用窑头熟料冷却机中段废气余热,装机规模7.5MW;风力发电方式利用所在区域北高南低的自然条件,在厂区内布置2台机组,容量9.1MW,周边区域规划集中式风电场,容量40.95MW。此外,介绍了垃圾焚烧发电方式的常规应用,提出了水泥企业提前规划布局氢能产业的设想,为实现水泥工厂的“零购电”提供了思路。This article compares the advantages and disadvantages of various clean energy power generation methods applied in cement plants.It introduces the layout of photovoltaic panels,the application of monocrystalline silicon solar cell modules,and the grid connection method of photovoltaic power generation systems with a capacity of 9.2MW.The average annual power generation within a 25 year lifespan is calculated to be 9504MW·h;The power generation method of the waste heat power station uses the waste heat from the middle section of the clinker cooling machine,with an installed capacity of 7.5MW;The wind power generation method utilizes the natural conditions of high in the north and low in the south in the area,and arranges two units with a capacity of 9.1MW in the factory area.A centralized wind farm with a capacity of 40.95MW is planned in the surrounding area.In addition,the conventional application of waste incineration power generation method was introduced,and the idea that cement enterprises need to plan and layout the hydrogen energy industry in advance was proposed,providing ideas for achieving"zero electricity purchase"in cement factories.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49