既有建筑外墙逆作法施工技术研究  

Research on Reverse Construction Method of Existing Building Exterior Wall Renovation

在线阅读下载全文

作  者:马金川 黄伟[1] 肖寒 王万民[1] 马永峰 Ma Jinchuan;Huang Wei;Xiao Han;Wang Wanmin;Ma Yongfeng(Beijing Construction Fourth Construction Engineering Co.,Ltd.,Beijing,100075)

机构地区:[1]北京建工四建工程建设有限公司,北京100075

出  处:《建设科技》2024年第12期66-68,共3页Construction Science and Technology

摘  要:在老旧小区既有建筑外墙抗震加固施工中,因施工环境的特殊性,基础施工过程中存在较多不可预见的交叉因素,严重影响现场施工安全及进度。为解决板墙基础大面积施工带来的弊端,提出了一种混凝土板墙加固逆作施工方法,首先完成上部墙体加固施工,待上部结构改造全部完成后,最后进行基础分段、快速施工,有效解决了传统施工顺序引起的进度延误及安全风险。In the anti-seismic reinforcement construction of the existing building exterior wall in old communities,there are many unforeseen cross factors in the foundation construction process due to the particularity of the construction environment,which seriously affect the safety and progress of the on-site construction.In order to solve the disadvantages caused by the large construction of slab wall foundation,a reverse construction method for concrete slab wall reinforcement is proposed.After completing the reinforcement construction of the upper wall structure,the foundation is segmented and constructed rapidly,which effectively solves the progress delay and safety risks caused by the traditional construction sequence.

关 键 词:既有建筑改造 基础施工 逆作法 

分 类 号:TU746.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象