检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭平 李茂 陈建航 吴祥 吕庆龙 苏栋[2,4,5] GUO Ping;LI Mao;CHEN Jianhang;WU Xiang;LV Qinglong;SU Dong(Hydropower Southern Construction Investment Co.,Ltd.Shenzhen 518052,China;College of Civil and Transportation Engineering,Shenzhen University Shenzhen 518060,China;Sinohydro Bureau 11 Co.,Ltd.Zhengzhou 450001,China;Key Laboratory of Coastal Urban Resilient Infrastructures(MOE),Shenzhen University Shenzhen 518060,China;Shenzhen Key Laboratory of Green,Efficient and Intelligent Construction of Underground Metro Station,Shenzhen University Shenzhen 518060,China)
机构地区:[1]中电建南方建设投资有限公司,深圳518052 [2]深圳大学土木与交通工程学院,深圳518060 [3]中国水利水电第十一工程局有限公司,郑州450001 [4]滨海城市韧性基础设施教育部重点实验室(深圳大学),深圳518060 [5]深圳市地下车站绿色高效智能建造重点实验室,深圳518060
出 处:《广东土木与建筑》2024年第7期32-35,共4页Guangdong Architecture Civil Engineering
基 金:广东省重点领域研发计划(2019B111105001);国家自然科学基金(52278364);深圳市高等院校稳定支持计划(20220808143139001);深圳大学2035追求卓越研究计划(2022B007)。
摘 要:针对深圳某地铁站矩形顶管隧道工程的超大断面、浅覆土、密贴顶进等特点,对顶管姿态控制难点进行分析,并对该工程采用的姿态测量、铰接纠偏、多螺旋机出土、多刀盘模式控制、注浆纠偏等多种技术结合的纠偏控制方案进行介绍。根据该工程实践表明:①顶管姿态偏移主要源于顶管开挖面及隧道两侧水土压力不平衡;②矩形顶管姿态控制重点是水平姿态以及垂直姿态控制;③通过采用铰接油缸控制、注浆纠偏、多螺旋机出土、多刀盘转动模式控制等技术,可有效控制顶管姿态。According to the characteristics of the rectangular pipe jacking tunnel project of a subway station in Shenzhen,such as superlarge section,shallow soil cover and close spaced jacking,the difficulties in the attitude control of pipe jacking tunnel are analyzed.The deviation control scheme combined with various measurement,such as deviation rectification by articulation cylinder,multi-screw machine excavation,multi-cutter mode control and deviation rectification by grouting adopted in the project is introduced.The practice shows that:①Attitude deviation of pipe-jacking tunnel is mainly due to the imbalance of soil and water pressure on pipe jacking excavation face and both sides of tunnel;②The focus of rectangular pipe-jacking tunnel attitude control is horizontal attitude and vertical attitude control;③By adopting the techniques of deviation rectification by articulation cylinder,multi-screw excavation,multi-cutter control and deviation rectification by grouting,the attitude of pipe-jacking tunnel can be effectively controlled.
关 键 词:矩形顶管隧道 超大断面 密贴顶进 姿态控制 铰接纠偏
分 类 号:U455.47[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.170.28