浅覆土下大截面大坡度矩形顶管开挖对既有市政道路影响分析  被引量:1

Analysis of the Impact of Rectangular Pipe Jacking Excavation with Large Cross-section and Large Slope under Shallow Overburden on Existing Municipal Roads

在线阅读下载全文

作  者:刘金涛 温江海 LIU Jintao;WEN Jianghai(Guangdong Basic Engineering Group Co.,Ltd.Guangzhou 510630,China;Guangdong Jianke Innovation Technology Research Institute Co.,Ltd.Guangzhou 510665,China)

机构地区:[1]广东省基础工程集团有限公司,广州510630 [2]广东建科创新技术研究院有限公司,广州510665

出  处:《广东土木与建筑》2024年第7期69-72,82,共5页Guangdong Architecture Civil Engineering

摘  要:矩形顶管大坡度顺坡顶进时易导致土层变形增加,对隧道线路既有管线、建构筑物及市政交通产生破坏。通过依托广州某管廊项目,结合数值分析,研究分析了施工过程中矩形顶管后靠背应力、顶管始发和接收技术,总结出大坡度矩形顶管隧道施工技术要点,拱顶上方土体总体变形最大值为-3.4mm,验证了顺坡始发时坡度的合理性,对受地质条件、地下管线等因素制约无法实施的地下通道建设具有一定的参考价值。Rectangular pipe jacking is easy to cause the deformation of the soil layer to increase when jacking down the slope with large slope,which will damage the existing pipelines,buildings and municipal traffic of the tunnel line.By relying on a pipeline corridor project in Guangzhou,combined with numerical analysis,research and analysis of the construction process of rectangular jacking pipe backrest stress,jacking pipe starting and receiving technology,summarized the main points of the construction technology of rectangular jacking pipe tunnel with large slope,the overall deformation of the soil above the vault maximum value of -3.4 mm,verified the slope reasonableness of the slope when starting downslope,for the underground passageway which can not be implemented due to the constraints of geologic conditions,underground pipeline and other factors,has a certain reference value.It has certain reference value for the construction of underground passages that cannot be implemented due to geological conditions,underground pipelines and other constraints.

关 键 词:大坡度 矩形顶管 顶进施工 触变泥浆 

分 类 号:U418[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象