检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯俊领 郑静逸 Feng Junling;Zheng Jingyi(China Water Conservancy and Electricity External Co.,Ltd.,Tongzhou 101100,Beijing,China)
机构地区:[1]中交集团中国水利电力对外有限公司,北京通州101100
出 处:《云南电力技术》2024年第3期73-75,共3页Yunnan Electric Power
摘 要:本文从南公1水电站投产中遇到的电力输送通道问题出发,辅以相关的改接线方案设计以及发电机进相试验与数据分析,佐证中资机构对老挝电站投资建设难题,提出中资投资重点方向,建议加快推进老挝骨干输电网互联互通建设,参与中国碳中和进程。Starting from the power transmission channel problems encountered in the operation of Nam Kong 1 Hydropower Station,supplemented by relevant wiring modification scheme design and generator phase advance tests and data analysis,confirmed the difficulties of Chinese Investment and construction hydropower station in Laos,puts forward the key direction of investment,and suggests accelerating the transmission line interconnected construction in Laos and participating in China's carbon neutralization process.
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49