作 者:杨浚文 Yang Junwen(Yunnan Power Grid Co.,Ltd.,Kunming 650011,Yunnan,China)
出 处:《云南电力技术》2024年第3期94-98,共5页Yunnan Electric Power
摘 要:永富直流“十三五”期间主要以送电广西电网为主,随着滇东南地区负荷的快速增长,永富直流需回送云南电网,满足新增负荷的用电需求,减轻云南电网500 kV南北交流断面和滇东南500 kV交流断面的输送潮流。本文对现状电网永富直流回送云南电网以及500 kV柳井输变电工程投产后永富直流回送云南电网的系统稳定性进行了仿真分析。仿真结果显示,现状电网不能完全满足永富直流回送云南电网的运行要求,500 kV柳井输变电工程投产后永富直流具备回送云南电网的条件。During the 13th Five-Year Plan period,Yongfu HVDC mainly transmission power to Guangxi grid.With the rapid growth of load in Southeast Yunnan,Yongfu HVDC needs to transmission power to Yunnan grid to meet the demand of new load and reduce the transmission tide of 500 kV north-south section of Yunnan grid and 500 kV AC section of Southeast Yunnan.This paper presents a simulation analysis of the system stability of Yongfu HVDC transmission power to Yunnan of the current grid and the grid after the commissioning of the 500 kV Liujing transmission project.The simulation results show that the current grid can not fully meet the operational requirements for the power transmission of Yongfu HVDC to the Yunnan grid,while it will be available after the commissioning of 500 kV Liujing transmission project.
关 键 词:高压直流送电 受端电网 机电暂态仿真 RTDS仿真 安全稳定分析
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.122.164