检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯辉 FENG Hui(Changzhi Co.,Ltd.,Shanxi Coal Transportation and Sales Group,Changzhi 046000,Shanxi,China)
机构地区:[1]山西煤炭运销集团长治有限公司,山西长治046000
出 处:《能源与节能》2024年第7期72-74,85,共4页Energy and Energy Conservation
摘 要:对矿井工作面充水情况展开分析,在对顶板水害进行评价的基础上,开展了工作面涌水量预测,并对工作面排水系统性能进行了验证。结合矿井实际情况,分析了引发水害的原因并查明了充水途径,同时进行了矿区阻水性能分区,进而对矿坑涌水量进行预测,既能为矿井顺利排水提供可靠依据,又能较好地预防突水事故发生,指导矿井安全生产。An analysis was conducted on the water filling situation in the coal mine working face.Based on the evaluation of the water damage to the roof of the working face,a prediction of the water inflow in the working face was carried out,and the performance of the drainage system in the working face was verified.Based on the actual situation of the mine,the causes of water damage were analyzed and the water filling pathway was identified.At the same time,the water blocking performance zoning of the mining area was carried out,and the water inflow of the mine pit was predicted.This can provide reliable basis for the smooth drainage of the mine and effectively prevent water inrush accidents,guiding the safe production of the mine.
关 键 词:微子镇煤业 15101工作面 充水因素 涌水量预测
分 类 号:TD742.1[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229