盘城岭煤矿150105工作面回风顺槽过X08陷落柱防治水技术研究  

Water Control Technology of Air Return Crossheading through X08 Collapse Column in 150105 Working Face of Panchengling Coal Mine

在线阅读下载全文

作  者:张永杰 ZHANG Yongjie(Jinzhong Co.,Ltd.,Shanxi Coal Transportation and Sales Group,Jinzhong 030600,Shanxi,China)

机构地区:[1]山西煤炭运销集团晋中有限公司,山西晋中030600

出  处:《能源与节能》2024年第7期295-298,共4页Energy and Energy Conservation

摘  要:陷落柱周边的水害问题一直是制约煤矿安全高效生产的关键,将盘城岭煤矿150105工作面遇到的X08陷落柱作为研究对象,使用音频电穿透勘探技术对该陷落柱的导水性进行了全面分析,可知其导水性较差,因此,为了更好地提升150105工作面回采的安全性,对X08陷落柱采取了注浆堵水的治理措施,并通过后续的地质勘察,明确了X08陷落柱水害治理效果良好。The problem of water damage around the collapse column has always been the key to restricting the safe and efficient production of coal mines.The X08 collapse column encountered by the 150105 working face of Panchengling Coal Mine was taken as the research object,and the water conductivity of the collapse column was comprehensively analyzed by using audio electric penetration exploration technology,and it was found that its water conductivity was poor.In order to better improve the safety of mining in 150105 working face,the X08 collapse column has been treated with grouting for water blocking,and through the follow-up geological investigation,it is clear that the X08 subsidence column has good water damage treatment effect.

关 键 词:盘城岭煤矿 回风顺槽 陷落柱 防治水 技术措施 

分 类 号:TD745[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象