检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:栗之炜 LI Zhiwei(China Submarine Cable Construction Co.,Ltd.,Shanghai 200041,China)
出 处:《建筑施工》2024年第7期1069-1071,共3页Building Construction
摘 要:随着国内海光缆施工项目逐渐推向深海,传统的海底光缆施工方式的施工精度已经不能满足深海海底光缆施工的需要。将海缆施工设备数字化,将海缆施工系统集成化成为大势所趋。实践表明,经过数字集成化的施工系统能够胜任各类地形环境、各种水深的施工环境,有效提升海光缆施工质量。With the domestic submarine optical cable construction projects increasingly extending to the deep sea,the construction precision of traditional methods is no longer sufficient to meet the demands of deep-sea cable laying.The digitalization of submarine cable construction equipment and the integration of the construction system have emerged as the prevailing trend.Practical applications demonstrate that a digitally integrated construction system is capable of handling a variety of terrain and water depth conditions,significantly improving the quality of submarine optical cable installation.
分 类 号:TU741[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49