检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈华亮 CHEN Huaiang(Shanghai Construction No.1(Group)Co.,Ltd.,Shanghai 200120,China)
出 处:《建筑施工》2024年第7期1085-1088,共4页Building Construction
基 金:上海建工一建集团有限公司课题(2018-020)。
摘 要:我国建筑行业的发展面临着周边管线密集、地质条件差、基坑附近建筑保护等问题。以上海市普陀天安阳光广场东地块项目为实例,介绍了施工过程中针对邻近深基坑的4栋保护建筑采取的沉降控制措施,包括桩基围护施工阶段沉降控制措施、基坑降水阶段沉降控制措施、挖土施工阶段沉降控制措施。通过监测分析,3项措施的具体施工过程有效地实现了对保护建筑的沉降控制,可为类似邻近深基坑项目的历史建筑保护提供参考。The development of China's construction industry is facing the problems of dense surrounding pipelines,poor geological conditions,and protection of buildings near foundation pits.Taking the east block project of Tian'an Sunshine Plaza in Putuo District of Shanghai as an example,the settlement control measures for four protected buildings adjacent to deep foundation pit during construction are introduced,including the settlement control measures for pile foundation enclosure construction stage,foundation pit dewatering stage and excavation construction stage.Through monitoring and analysis,the specific construction process of the three measures effectively realized the settlement control of the protected building,which can provide a reference for the protection of similar historic buildings adjacent to deep foundation pit projects.
关 键 词:历史保护建筑 深基坑工程 施工过程控制 沉降变形 监测分析
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.20.224.152