厦门抽水蓄能电站排风竖井运输提升系统设计与应用  被引量:1

Design and Application of Transport and Elevation System for Ventilation Shafts of Pumped Storage Power Stations in Xiamen

在线阅读下载全文

作  者:王小华 WANG Xiaohua(Power China Sinohydro Bureau 16 Co.,Ltd.,Fuzhou 350003,China)

机构地区:[1]中国水利水电第十六工程局有限公司,福建福州350003

出  处:《中国水能及电气化》2024年第7期1-8,共8页China Water Power & Electrification

摘  要:文章以厦门抽水蓄能电站排风竖井运输提升系统设计为例,从竖井开挖方法、运输提升系统设计、设备选择与验算等方面对此方案进行了详细介绍。通过技术比选,结合工程实际,决定采用“双筒绞车+卷扬机+防坠吊笼/吊桶”方案,以解决竖井施工期间人员、设备、材料运输、覆盖层开挖出渣等问题。该运输提升系统有效解决了施工期间人员、设备、材料运输、覆盖层开挖出渣等问题,可供类似工程参考。This paper takes the design of the transport and elevation system for ventilation shafts in Pumped Storage Power Stations in Xiamen as an example and provides a detailed introduction to the excavation method of the shaft,the design of the transport and elevation system,equipment selection,and verification.Through technical comparisons and considerations of engineering practicality,it is determined to adopt the“double-drum winch+hoist+anti-falling cage/bucket”scheme to address issues such as personnel,equipment,and material transportation,as well as excavation residue disposal during shaft construction.This transport and elevation system effectively solves the transportation of personnel,equipment,and materials,as well as the disposal of excavation residue during construction,and can serve as a reference for similar projects.

关 键 词:抽水蓄能电站 排风竖井 竖井开挖 运输提升系统 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象