桃源水电站厂房渗漏量监测解决方案  

Solution for Leakage Monitoring in Taoyuan Hydropower Station Powerhouse

在线阅读下载全文

作  者:李霸军 章浪 田国民 LI Bajun;ZHANG Lang;TIAN Guomin(China Hydropower Consulting Group Taoyuan Development Co.,Ltd.,Changde 415000,China)

机构地区:[1]中国水电顾问集团桃源开发有限公司,湖南常德415000

出  处:《中国水能及电气化》2024年第7期9-13,共5页China Water Power & Electrification

摘  要:桃源水电站厂房渗流量通过“集水井水位法”人工换算,其观测精度不高,为了提高监测精度,改进观测方法,结合工程实际研究提出一种新的计算方法:“水位控制集水井容积法”,此方法场地和流量适应性强,不受抽排水过程的影响。At the Taoyuan Hydropower Station,the leakage flow rate from the powerhouse is traditionally manually calculated using the“water level method”at collection wells,which results in limited observation accuracy.In order to improve monitoring precision,a new method called the“water level-controlled collection well volume method”is proposed,considering practical engineering aspects.This method exhibits strong adaptability to site conditions and flow rates,and is not affected by the pumping and draining processes.

关 键 词:集水井 渗漏量 水位控制集水井容积法 

分 类 号:TV731[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象