检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈小洪 CHEN Xiaohong(Yunnan Institute of Water Resources and Hydropower Science,Kunming 650228,China)
机构地区:[1]云南省水利水电科学研究院,云南昆明650228
出 处:《中国水能及电气化》2024年第7期19-22,70,共5页China Water Power & Electrification
摘 要:在水库除险加固设计中,优选适宜的大坝防渗处理方案是解决大坝渗漏问题的关键。文章以磷矿水库为例,通过分析地勘资料找准大坝渗漏位置和成因,查清坝体坝基岩(土)层类型、结构、渗透性,再结合工程投资、施工条件、建筑材料取用情况等进行多方面比较,最终从帷幕灌浆、黏土斜墙、土工膜三个方案中选择了帷幕灌浆方案作为大坝防渗处理措施。本文介绍的磷矿水库大坝防渗处理方案的比选过程,可为同类工程设计提供参考和借鉴。In the design of safety enhancement for reservoirs,selecting the appropriate seepage control measures is crucial in addressing leakage issues.Taking a phosphate mine reservoir as an example,this paper identifies the location and causes of dam seepage through the analysis of geological survey data.It examines the types,structures,and permeability of dam body and foundation rock(soil)layers,and compares various factors including engineering investment,construction conditions,and availability of construction materials.After considering curtain grouting,clay blanket,and geomembrane options,the curtain grouting scheme is ultimately chosen as the seepage control measure for the dam.The paper outlines the process of selecting the seepage control measures for the phosphate mine reservoir dam,providing valuable reference and guidance for similar engineering designs.
分 类 号:TV698.23[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49