检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱健 Zhu Jian(China Railway Construction Engineering Group Fourth Construction Company,Shanghai 200000)
出 处:《江西建材》2024年第4期289-290,共2页
摘 要:南昌东站钢屋盖工程分为三个分区,屋盖为三联钢桁架拱,结构形式复杂,滑移支架高度最高为56 m,高度高,所受荷载大,传统屋盖对称形式设计对称支撑用钢量大,施工时间长,不满足现代建筑的节能要求。文中结合钢屋盖结构形式及现场施工条件,设计非对称滑移支撑,既满足滑移支架施工受力要求,又节约成本及工期,确保了施工安全。The steel roof project of Nanchang East Railway Station is divided into three zones,the roof is a triple steel truss arch,the structure is complex,the maximum height of the sliding bracket is 56 m,the height of the sliding bracket is high,and the load is large.The traditional design based on the symmetrical form of the roof uses a large amount of steel to support,and the construction time is long,which cannot meet the goal of saving and efficient modern engineering.In this paper,based on the structural form of steel roof and the site construction condi-tions,the design of the asymmetric slip support,not only meet the requirements of the slip support construction force,but also save the cost and time limit,to ensure the accurate and safe construction.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.15.153