厚硬顶板大巷大间距锚杆支护设计  

Design of large spacing anchor rod support in thick and hard roof roadway

在线阅读下载全文

作  者:李耀晖 Li Yaohui(Jincheng Company Qiyi Mine,Jinneng Holding Group Co.,Ltd.,Jincheng 048406,China)

机构地区:[1]晋能控股集团晋城公司七一煤矿,山西晋城048406

出  处:《煤炭与化工》2024年第6期7-13,共7页Coal and Chemical Industry

摘  要:针对七一煤矿15号煤层大巷厚而坚硬顶板支护条件,利用理论分析、室内试验、工程类比、数值模拟等综合手段,获得了15号煤层大巷围岩物理力学参数,确定了其松动范围为0.65~0.8 m,属于小松动圈,计算了大巷围岩K2石灰岩、泥岩、铝土质泥岩RMR分值分别为51、45、47,属于Ⅲ级较好岩体,为锚杆长度和强度选择提供一定依据。通过分析4种支护方案下的锚杆(索)轴力、偏应力和最大主应力,以及塑性区分布情况,提出了大间距锚杆支护设计,认为15号煤层大巷锚杆间距为1.2 m、锚索间距为2.4~3.6 m,能够满足支护要求。研究成果为类似条件下巷道围岩稳定性控制提供一定参考。Aiming at the supporting conditions of thick and hard roof of No.15 coal seam roadway in Qiyi Mine,the physical and mechanical parameters of surrounding rock of No.15 coal seam roadway were obtained by means of theoretical analysis,laboratory test,engineering analogy and numerical simulation.It was determined that the loose range was about 0.65~0.8 m,which belonged to the small loose circle.The RMR scores of K2 limestone,mudstone and bauxite mudstone in the surrounding rock of the roadway were calculated to be 51,45 and 47 respectively,which belonged to the better rock mass of grade III,which provided a certain basis for the selection of bolt length and strength.By analyzing the axial force,deviatoric stress,maximum principal stress and plastic zone distribution of bolt and anchor cable under four support schemes,the design of large spacing bolt support was put forward.It was considered that the bolt spacing of No.15 coal seam roadway was 1.2 m and the anchor cable spacing was 2.4~3.6 m,which can meet the support requirements.The research results provide some reference for the stability control of roadway surrounding rock under similar conditions.

关 键 词:厚硬顶板 大间距 地质力学评估 数值模拟 支护设计 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象