掘进工作面煤岩动力灾害声电响应特征  

Acoustic-electric response characteristics of coal rock dynamic disasters in driving face

在线阅读下载全文

作  者:荆新军 陈明明[1] 雷东记 Jing Xinjun;Chen Mingming;Lei Dongji(Shanxi Jinmei Group Technology Research Institute Co.,Ltd.,Jincheng 048000,China;Shanxi Jinmei Group Jinming Mining Co.,Ltd.,Jincheng 048000,China;Henan Polytechnic University,Jiaozuo 454000,China)

机构地区:[1]山西晋煤集团技术研究院有限责任公司,山西晋城048000 [2]山西晋煤集团金明矿业有限责任公司,山西晋城048000 [3]河南理工大学,河南焦作454000

出  处:《能源与环保》2024年第6期40-44,共5页CHINA ENERGY AND ENVIRONMENTAL PROTECTION

基  金:河南省高等学校重点科研项目(22A440003);河南省高校基本科研业务费专项资金资助项目(NSFRF200307)。

摘  要:为了监测、预警掘进过程中前方可能发生的危险,在掘进工作面布设声电监测预警系统,利用声发射技术和电磁辐射技术对掘进巷道进行动态实时监测和预警,通过对掘进过程中异常声电响应特征的研究得到突出危险发生的前兆规律特征,并根据现场实际情况进行了验证。结果表明,掘进过程中,声发射、电磁辐射强度整体变化趋势呈现3个阶段;煤与瓦斯突出危险发生时,声电强度参数响应剧烈,出现了明显的声增电降趋势,且声发射、电磁辐射强度与瓦斯浓度呈显著相关,瓦斯浓度突增与声电信号异常基本是同步发生的;声—电—瓦斯能够反映煤岩石动力演化过程中的变化情况,可将第一次声电异常波动定为瓦斯预警前兆开始时间,超前预警8 h左右。由此可以看出,通过研究声—电—瓦斯的异常响应,能够实现煤与瓦斯突出的预警预报。In order to monitor and warn the possible dangers ahead in the process of digging,the acoustic-electric monitoring and warning system was deployed in the driving face,and the dynamic real-time monitoring and warning of the driving roadway was carried out by utilizing the acoustic emission technology and the electromagnetic radiation technology,and the precursor law characteristics before the occurrence of the protrusion danger were obtained through the research of the abnormal acoustic and electric response characteristics in the process of driving and verified in accordance with the actual site conditions.The results show that:during the driving process,the overall trend of changes in acoustic emission and electromagnetic radiation intensity shows three stages.When the danger of coal and gas outburst occurs,the acoustic-electric intensity parameters respond violently,showing a clear trend of acoustic increase and power decrease.The intensity of acoustic emission and electromagnetic radiation is significantly correlated with gas concentration,and the sudden increase in gas concentration and abnormal acoustic-electric signals basically occur synchronously.Acoustic-electric gas can reflect the changes in the dynamic evolution process of coal and rock,and the first abnormal fluctuation of acoustic-electric can be set as the start time of gas warning precursor,with an advance warning of about 8 hours.It can be seen that by studying the abnormal response of acoustic-electricity-gas,the early warning prediction of coal and gas protrusion can be realized.

关 键 词:掘进工作面 声电监测预警系统 声电响应特征 声—电—瓦斯 

分 类 号:TD713[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象