大宁调蓄水库“23·7”流域性特大洪水入库库区清淤方案研究  

Research on the dredging plan for the storage area of the"23.7"watershed catastrophic flood in Daning Reservoir

在线阅读下载全文

作  者:王靖宇 苏涛 李骁哲 WANG Jingyu;SU Tao;LI Xiaozhe(Beijing South to North Water Daning Management Office,Beijing 102442,China;Beijing Urban Rivers and Lakes Management Division,Beijing 100143,China;North China University of Technology,Beijing 100144,China)

机构地区:[1]北京市南水北调大宁管理处,北京102442 [2]北京市城市河湖管理处,北京100143 [3]北方工业大学,北京100144

出  处:《北京水务》2024年第3期12-15,共4页Beijing Water

摘  要:为更好地解决北京市南水北调大宁调蓄水库遭受“23·7”流域性特大洪水形成的水库淤积问题,参照大宁调蓄水库清淤方案,进行入库淤积勘察,分析洪水入库对水库影响,比选现有库区清淤方式。结果表明:环保生态清淤方式对土质适应性、施工效率、周边环境、二次污染和水生态保护的影响均比其他方式小,且造价中等;同时避免了库区排水,节约了大量水资源,降低了能耗,减少了对库区生态的干扰。研究成果可为该类水库清淤工程提供新思路。To address the issue of sedimentation caused by the"23.7"catastrophic flood in the Daning Reservoir of South-to-North Water Diversion Project in Beijing area,a dredging scheme for the reservoir was investigated.The impact of flood inflow on the reservoir was analyzed through the analysis of sedi-ment deposition situation.A comparative analysis of existing dredging methods in the reservoir area was conducted.Results indicated that the environmental ecological dredging method exhibited better adapt-ability in terms of soil quality,construction efficiency,impact on the surrounding environment,secondary pollution risks,and effects on water ecological preservation compared to other methods,which also pre-sented with a moderate cost.This method conserved significant water resources,reduced energy consump-tion,and minimized disruption to the ecological environment of the reservoir through the approach of avoiding drainage in the storage area.These findings of this research will offer innovative insights for simi-lar reservoir dredging projects.

关 键 词:大宁调蓄水库 洪水 清淤 

分 类 号:TV851[水利工程—水利水电工程] X52[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象