作 者:郭石开 GUO Shikai(Inner Mongolia Jinghai Coal Gangue Power Generation Co.,Ltd.,Wuhai,Inner Mongolia 016000,China)
机构地区:[1]内蒙古京海煤矸石发电有限责任公司,内蒙古乌海016000
出 处:《自动化应用》2024年第S01期140-142,148,共4页Automation Application
摘 要:针对电力系统存在外购电量逐年增加、无备用电源的问题,提出对#1、#2机组6 kV A/B配电段进行技术改造的方案。通过引入联络断路器改变配电段的供电方式,减少外购电量和提高设备运行安全稳定性,从而降低电力成本。经详细的可行性分析,预计技术改造成本可在4年6个月内收回,为企业带来可观的经济利益。A technical renovation plan is proposed for the 6 kV A/B distribution section of Units#1 and#2 in response to the problem of increasing purchased electricity and lack of backup power sources in the power system.By introducing contact circuit breakers to change the power supply mode of the distribution section,the purchased electricity is reduced and the safety and stability of equipment operation are improved,thereby reducing power costs.After a detailed feasibility analysis,it is expected that the cost of technological transformation can be recovered within 4 years and 6 months,bringing considerable economic benefits to the enterprise.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7