检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐乐 张艳 雷茂哲 TANG Le;ZHANG Yan;LEI Maozhe(China Water Resources Pearl River Planning,Survey and Design Co.,Ltd.,Guangzhou 510610,China)
机构地区:[1]中水珠江规划勘测设计有限公司,广州510610
出 处:《广东水利水电》2024年第7期1-6,共6页Guangdong Water Resources and Hydropower
摘 要:迈湾水利枢纽坝式进水口采用叠梁门分层取水,进水口顺水流向依次为拦污栅段、叠梁门段、快速事故闸门段、进口段及渐变段。采用三维有限元法对进水口结构进行内力计算分析,获取结构在弹性阶段的截面应力图形,按弹性主拉应力图形配置钢筋,解决了使用传统解析法结构计算大体积异形结构复杂受力条件下的钢筋配比困难的问题,其计算结果可供类似工程探讨和参考。The Maiwan dam inlet adopts a stacked beam gate for stratified water intake.The inlet follows the flow direction as follows:trash rack section,stacked beam gate section,rapid accident gate section,inlet section,and transition section.The internal force calculation and analysis of the intake structure were carried out by using the three-dimensional finite element method,and the cross-sectional stress graph of the structure in the elastic stage was obtained.Reinforcement was configured according to the elastic principal tensile stress graph,solving the problem of difficulty in calculating the reinforcement ratio of large volume irregular structures under complex stress conditions using traditional analytical methods.The calculation results can be used for similar engineering discussions and references.
关 键 词:坝式进水口 分层取水 有限元分析 应力积分 非杆件大体积结构配筋
分 类 号:TV314[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.251.131