红江拦河闸消能工优化试验研究  

Experimental Study on Optimization of Hongjiang Dissipator Sluice

在线阅读下载全文

作  者:张广传[1,2,3] 练伟航 宫鹏杰[1,2,3] 丘佳永 ZHANG Guangchuan;LIAN Weihang;GONG Pengjie;QIU Jiayong(Guangdong Research Institute of Water Resources and Hydropower,Guangzhou 510635,China;Guangdong Key Laboratory of Hydrodynamic Research,Guangzhou 510635,China;National and Local Joint Engineering Laboratory of Estuarine Water Technology,Guangzhou 510635,China)

机构地区:[1]广东省水利水电科学研究院,广州510635 [2]广东省水动力学应用研究重点实验室,广州510635 [3]河口水利技术国家地方联合工程实验室,广州510635

出  处:《广东水利水电》2024年第7期7-10,共4页Guangdong Water Resources and Hydropower

摘  要:通过新建红江闸工程水工断面模型试验,研究了闸后水流流态、流速分布等情况,针对设计方案闸下水流衔接不利、海漫跌水严重、流速过大等问题,提出取消消力墩、降低消能防冲段整体高程、调整闸门初始开度等优化措施,明显改善闸后流态,减缓出池水流流速,有效提高了闸下消能防冲能力,保障水闸运行安全。研究成果在工程中得以应用并取得预期成效,可为类似工程的设计和建设提供参考。Through Hongjiang Sluice hydraulic model tests,the flow pattern and velocity distribution of the water flow behind the Hongjiang Gate were studied.In response to the issues of unfavorable energy dissipation under the gate,excessive head fall in the apron,and excessive flow velocity in the design scheme,optimization measures such as removing the energy dissipation pier,decreasing the overall elevation of the section for energy dissipation and erosion prevention,and adjusting the initial opening of the gate were proposed,which improv the energy dissipation and erosion prevention capacity and improve the safety of the gate operation.The research results have been applied in engineering and achieved expected results,providing reference for the design and construction of similar projects.

关 键 词:拦河闸 断面模型 泄流流态 消能防冲 闸门调度 

分 类 号:TV135.2[水利工程—水力学及河流动力学]

 