检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张剑楚 ZHANG Jianchu(JSTI Group,Zhejiang Branch,Hangzhou 310030,China)
机构地区:[1]苏交科集团股份有限公司浙江分公司,杭州310030
出 处:《交通工程》2024年第7期60-66,72,共8页Journal of Transportation Engineering
摘 要:以海宁观潮节为例,在道路网极不完善的乡村,解决大规模观潮活动的交通疏散问题。针对该类活动的特点,提出了时间上、空间上以及时空结合的多种削峰填谷措施,有效地缓解了退场人群在时空上的过分集中,在实践中取得了良好的效果,可为类似交通设施薄弱地区举办大型活动提供参考。This paper takes the Haining Tide Festival as an example to solve the traffic evacuation problem of large-scale tide watching activities in the countryside where the road network is very imperfect.For the characteristics of this kind of activities,the article puts forward a variety of measures to cut peaks and fill valleys in time,space,and time-space combination,which effectively alleviates the excessive concentration of the retreating crowds in time and space,and achieves good results in practice,which can provide a reference for similar large-scale activities held in areas with weak transportation facilities.
关 键 词:交通管理 大型活动 交通疏散 组合出行 停车换乘 接驳公交 交通缓冲带 削峰填谷
分 类 号:U491[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.74.90