检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵策 Zhao Ce(China Railway 12th Bureau Group Second Engineering Co.,Ltd.,Taiyuan 030032,Shanxi Province,China)
机构地区:[1]中铁十二局集团第二工程有限公司,山西太原030032
出 处:《建筑与装饰》2024年第14期82-84,共3页Construction & Decoration
摘 要:本文以道路桥梁工程为研究对象,着重分析了此类项目中沉降段路基路面施工的相关要点。本文采取理论分析方式,从道路桥梁沉降段路基路面的沉降原因着手,指出了项目实施中沉降段路基路面施工的关键环节,旨在强调沉降段路基路面施工对道路桥梁结构性能、使用性能等的重要影响。有关人员在面对道路桥梁沉降段施工作业时需强化技术管理、质量控制,规范施工步骤,提高施工作业的整体水平。Taking road and bridge engineering as the research object,this paper focuses on analyzing the relevant key points of settlement section roadbed and pavement construction in such projects.Using a theoretical analysis approach,this paper first introduces the settlement reasons of the roadbed and pavement in the settlement section of roads and bridges,points out the key links of the roadbed and pavement construction in the settlement section during the project implementation,aims to emphasize the important impact of the roadbed and pavement construction in the settlement section on the structural performance and service performance of roads and bridges.Relevant personnel need to strengthen technical management and quality control,standardize construction steps,and improve the overall level of construction work when facing road and bridge settlement section construction operations.
分 类 号:U41[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.113