检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张浩 ZHANG Hao
机构地区:[1]中煤科工西安研究院(集团)有限公司,陕西西安710000 [2]西安煤科地热能开发有限公司,陕西西安710000
出 处:《节能》2024年第6期73-76,共4页Energy Conservation
摘 要:“源-网-荷-储”协调优化运营模式,为我国能源转型和发展提供一种新的发展思路,长距离输热管网作为渠道和桥梁,为能源高效、节能、安全和持续稳定开发利用保驾护航。以某长输蒸汽管网EPC项目为例,按照新型管网设计理念,从项目优化设计、管材选购和项目运行效果等方面进行分析研究,通过投产和运行测试,管网达到冬季表面积雪不化的超低能耗热网输配效果。The coordinated optimization operation mode of'source-network-load-storage'provides a new development perspective for China's energy transition and development.Long-distance heat transportation networks serve as channels and bridges,ensuring the efficient,energy-saving,safe,and continuous and stable development and utilization of energy.Taking a certain long-distance steam pipeline EPC project as an example,according to the new pipeline design concept,this paper analyzes and studies from aspects such as project optimized design,pipeline material selection,and project operation effect.Through commissioning and operational testing,the pipeline network achieves the effect of ultra-low energy thermal network distribution with no surface snow melting in winter.
关 键 词:长距离输蒸汽管网 EPC项目 管网优化设计 管材优选
分 类 号:TU995.3[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.198.85