检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李列 卢佳乐 朱文祥 LI Lie;LU Jiale;ZHU Wenxiang(Tiantang Pumped Storage Branch,Hubei Zhengyuan Electric Power Group Co.,Ltd.,Luotian 438600,China)
机构地区:[1]湖北正源电力集团有限公司天堂抽水蓄能分公司,湖北罗田438600
出 处:《水电与新能源》2024年第7期72-74,共3页Hydropower and New Energy
摘 要:针对天堂抽水蓄能电厂2号机组导叶轴套漏水问题,结合2号机组在现场运行的实际情况以及机组导叶轴套机构,自主设计了一套导叶轴套止漏水装置,该装置加装方便,改善明显,且响应迅速,有效降低了因顶盖水位过高造成的机组非正常停机,确保了运行安全、改善了运行环境、提高了运行效率、节约了运行成本。Leakage problem is observed in the guide vane sleeve of the No.2 unit in Tiantang Pumped Storage Power Station.Considering the practical operation conditions of the No.2 unit and the structure of the guide vane sleeve,a guide vane sleeve leakage prevention device is designed.This device is easy to install and response quickly,and can significantly improve the working performance of the unit and effectively avoid abnormal shutdown caused by high water level on the head cover.It ensures the operation safety,improves the operation environment and the operation efficiency,and saves operation costs.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.107.255