检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲁伟 张历峰 华伟 吴焘 LU Wei;ZHANG Lifeng;HUA Wei;WU Tao(Binhu Coal Mine,Zaozhuang Mining Group Co.,Ltd.)
机构地区:[1]枣庄矿业(集团)有限责任公司滨湖煤矿,山东省枣庄市277000
出 处:《现代矿业》2024年第6期231-235,共5页Modern Mining
摘 要:为了精确预测滨湖煤矿16煤开采导水裂隙带发育高度,收集华北煤田31个下组煤开采工作面实测数据,选取采高、采深、煤层倾角、倾向长度、硬岩比例系数5个因素进行综合分析。运用哈里斯鹰算法(HHO)优化ELM神经网络,构建了HHO-ELM导水裂隙带高度预测模型,将其应用于滨湖煤矿导水裂隙带高度预计,并将预测结果与规范公式计算结果和实测结果进行对比。结果表明:HHO-ELM模型预测滨湖煤矿21603工作面导水裂隙带发育高度为24.17 m,规范公式计算结果为18.58~29.78 m,实测结果为21.45~22.98 m。可见,采用HHO-ELM模型预计导水裂隙带高度,计算简单,针对性强,预测精度可靠,为滨湖煤矿及相似地质条件下的华北型煤田下组煤开采顶板水害治理决策提供了依据。In order to accurately predict the development height of water-conducting fracture zone in 16 coal mining of Binhu Coal Mine,the measured data of 31 lower coal mining faces in North China Coal⁃field were collected,and five factors including mining height,mining depth,coal seam dip angle,tendency length and hard rock ratio coefficient were selected for comprehensive analysis.The Harris Hawk algorithm(HHO)is used to optimize the ELM neural network,and the HHO-ELM water-conducting fracture zone height prediction model is constructed.The model is applied to the prediction of the height of the water-con⁃ducting fracture zone in Binhu Coal Mine,and the prediction results are compared with the calculation re⁃sults of the standard formula and the measured results.The results show that the HHO-ELM model predicts that the development height of the water-conducting fracture zone in the 21603 working face of Binhu Coal Mine is 24.17 m,the calculation result of the standard formula is 18.58~29.78 m,and the measured result is 21.45~22.98 m.It can be seen that the model is used to predict the height of the water-conducting fracture zone,which is simple in calculation,strong in pertinence,and reliable in prediction accuracy.It provides a basis for the decision-making of roof water damage control in the lower group of coal mining in Binhu Coal Mine and similar geological conditions in North China Coalfield.
关 键 词:华北型煤田 导水裂隙带高度 HHO-ELM模型 注水测漏法
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.43.130