检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨春鹏 YANG Chunpeng(Taitou Coking Coal Co.,Ltd.,Shanxi Xiangning Coking Coal Group)
机构地区:[1]山西乡宁焦煤集团台头煤焦有限责任公司,山西省临汾市042100
出 处:《现代矿业》2024年第6期253-256,共4页Modern Mining
摘 要:针对山西某煤矿深部软岩运输大巷围岩变形量大的问题,通过分析不同侧压系数对围岩塑性区范围的影响,得到最大塑性区深度为1.8 m。根据该巷道地质条件和应力场分布情况,提出“锚网索喷+壁后注浆”联合支护方式。采用数值模拟和现场监测可知,采用该支护方案后,最大顶底板及两帮移近量均在150 mm以内,有效控制了巷道围岩变形。Aiming at the problem of large deformation of surrounding rock in deep soft rock main haul⁃age roadway of a coal mine in Shanxi Province,by analyzing the influence of different side pressure coeffi⁃cient on the plastic zone range of surrounding rock,the maximum plastic zone depth is 1.8 m.According to the geological conditions and stress field distribution of the roadway,the combined support method of′an⁃chor net cable spray+wall grouting′is proposed.Numerical simulation and field monitoring show that the maximum roof-to-floor and two-side convergence are within 150 mm after the support scheme is adopted,which effectively controls the deformation of roadway surrounding rock.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7