检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱晶铭 ZHU Jingming
机构地区:[1]福建省建筑科学研究院有限责任公司、福建省绿色建筑技术重点实验室,福建福州350108
出 处:《福建建设科技》2024年第4期105-109,共5页Fujian Construction Science & Technology
摘 要:本文以某主梁存在大量超限裂缝的钢筋混凝土现浇连续空心板梁桥为工程背景,针对桥梁的检测结果,采用有限元分析检算与现场荷载试验相结合的方法,分析对比试验及理论数据并结合检算结果对桥梁承载能力进行综合评定,分析结果表明该桥梁承载能力不满足规范要求。该桥的检测评定方法可为同类桥梁的检测评估加固提供参考。The reinforced concrete cast-in-place continuous hollow slab beam bridge with a large number of over limit cracks in a certain main beam was analyzed as an example.Based on the inspection results of the bridge,a combination of finite element analysis and on-site load testing was used to analyze and compare the experimental and theoretical data,and combined with the inspection results,the comprehensive evaluation of the bridge's bearing capacity was carried out.The analysis results showed that the bridge's bearing capacity did not meet the requirements of the specifications.The detection and evaluation method of this bridge can provide theoretical experience for the detection,evaluation,and reinforcement of similar bridges.
分 类 号:U448.212[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15