引绰济辽供水工程输水洞超声波测流优化研究  

Study on Optimization of Ultrasonic Flow Measurement in Water Tunnel of Water Supply Project Diverting from Chuo'er River to Xiliao River

在线阅读下载全文

作  者:黄燕 张绍兴 王记军 HUANG Yan;ZHANG Shaoxing;WANG Jijun(Water Supply Co.,LTD.,Diverting Water from Chuo'er River to Xiliao River in Inner Mongolia,Ulanhot,Inner Mongolia 137400,China;Qingwan Water Technology Co.,LTD.,of Qingdao Municipality,Qingdao,Shandong 266035,China)

机构地区:[1]内蒙古引绰济辽供水有限责任公司,内蒙古乌兰浩特137400 [2]青岛清万水技术有限公司,山东青岛266035

出  处:《山东水利》2024年第6期26-28,共3页Shandong Water Resources

摘  要:不规则断面无压隧洞瞬时流量的测量受测量方法、测点选择、断面形状、运行工况等各种因素影响,测量精度与输水工程的水量调度密切相关。本文以引绰济辽输水洞采用时差法超声波流量计进行流量测量为例,结合实际工程,选择合适的测流断面位置,对城门洞型无压隧洞等不规则断面流量测量的系统配置、断面选择、声道迭代方法进行分析。The measurement of instantaneous flow of non-pressure tunnel with irregular section is affected by various factors such as measurement method,measurement point selection,section shape,operating conditions,etc.The measurement accuracy is closely related to the water scheduling of water diverting project.In this paper,taking the ultrasonic flowmeter with time difference method for flow measurement in water tunnel of water diverting project from Chuo'er River to Xiliao River as an example,and combining with the physical engineering,the system configuration,section selection and sound channel iteration method of flow measurement of irregular section such as Chengmen tunnel without pressure are analyzed by selecting the appropriate section location based on practical projects.

关 键 词:无压隧洞 超声波流量计 断面选址 

分 类 号:TV675[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象