南张路桥工程防洪影响评价  被引量:1

Flood Control Impact Assessment of Nanzhang Road and Bridge Project

在线阅读下载全文

作  者:杨柳 YANG Liu(Jiaozuo Water Conservancy Technology Service Center,Jiaozuo 454000,China)

机构地区:[1]焦作市水利技术服务中心,河南焦作454000

出  处:《河南水利与南水北调》2024年第5期18-19,共2页Henan Water Resources & South-to-North Water Diversion

摘  要:南张路桥梁工程为焦作市大沙河水毁修复工程的一部分,焦作市大沙河水毁修复工程项目兼具防洪修复与生态环境景观修复等综合任务。文章从防洪标准和有关技术要求符合性、对河道行洪的影响、对河势稳定影响、对堤防安全及岸坡稳定和其他水利工程影响、建设项目施工期影响等方面综合论述,分析焦作南张路桥工程防洪影响,评价工程建设与防洪、河道管理等是否相抵触,保证工程满足河道防洪要求,为建设单位及河道管理部门决策提供科学依据。The Nanzhang Road Bridge Project is part of the Dasha River Water Damage Restoration Project in Jiaozuo City,which has comprehensive tasks such as flood control restoration and ecological environment landscape restoration.This paper comprehensively discusses the compliance of flood control standards and relevant technical requirements,the impact on river flooding,the impact on river stability,the impact on embankment safety and bank slope stability and other water conservancy projects,and the impact on the construction period of construction projects.It analyzes the flood control impact of Jiaozuo Nanzhang Road and Bridge Project,evaluates whether the project construction conflicts with flood control and river management,ensures that the project meets the flood control requirements of the river,and provides a scientific basis for the decision-making of the construction unit and the river management department.

关 键 词:防洪安全 河道行洪 堤防安全 岸坡稳定 

分 类 号:S274[农业科学—农业水土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象