检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨有平 Yang Youping(Lanzhou Railway Design Institute Co.,Ltd.,Lanzhou Gansu 730000,China)
机构地区:[1]兰州铁道设计院有限公司,甘肃兰州730000
出 处:《山西建筑》2024年第16期89-91,127,共4页Shanxi Architecture
摘 要:盾构机盾尾包裹是施工中经常遇到的问题,往往会造成设备损坏、工期拖延、成本消耗。研究盾构机盾尾包裹成因,掌握脱困技术,以及制定切实可行的预防措施,在盾构施工中尤为重要。结合某城际轨道交通项目施工中盾尾包裹脱困实践,分析了盾尾包裹产生的原因,通过采取地层加固、增加盾体润滑、盾体和管片保护、增加辅助千斤顶等系列技术措施,实现了盾构机的安全脱困,为类似工程提供经验和参考。Shield tail wrapping of shield tunneling machines is a common problem encountered during construction,which often leads to equipment damage,project delays,and cost consumption.Studying the causes of shield tail wrapping in shield tunneling machines,mastering the techniques for overcoming difficulties,and formulating practical and feasible preventive measures are particularly important in shield tunneling construction.Based on the practical experience of shield tail wrapping during the construction of a certain intercity rail transit project,this paper analyzes the causes of shield tail wrapping.By adopting a series of technical measures such as ground reinforcement,increasing shield lubrication,shield and pipe protection,and adding auxiliary jacks,the safety of shield tunneling machines has been achieved,providing experience and reference for similar projects.
关 键 词:大埋深 复杂地层 土压平衡盾构机 盾构施工 脱困技术
分 类 号:TU621[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117