检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈子江 CHEN Zijiang(Guizhou Geology and Mineral Foundation Engineering Co.,Ltd.,Guiyang 550081,China;Institute of Geophysical and Geochemical Exploration of Guizhou Provincial Bureau of Geology and Mineral Exploration and Development,Guiyang 550018,China)
机构地区:[1]贵州地矿基础工程有限公司,贵州贵阳550081 [2]贵州省地矿局地球物理地球化学勘查院,贵州贵阳550018
出 处:《测绘与空间地理信息》2024年第7期203-206,214,共5页Geomatics & Spatial Information Technology
摘 要:获取边坡的监测数据进行分析,并预测其接下来的变化趋势,具有重要的意义。本文以贵州省福泉市高坪矿区英坪矿段内边坡工程项目为研究对象,对监测数据采用时间序列AR(P)模型方法进行了分析与预测。研究结果表明,模型拟合的结果和预测精度较好地反映了监测点的变化趋势,可为矿区边坡模型建立和监测数据的预测提供一定的参考。It is of great significance to obtain the monitoring data of slope for analyzing and predicting its next change trend.Taking the slope engineering project in Yingping section of Gaoping mining area in Fuquan city,Guizhou province as the research object,this pa-per analyzes and forecasts the monitoring data by using the time series AR(P)model method.The results show that the fiting results and prediction accuracy of the model can better reflect the change trend of monitoring points,and can provide a certain reference for the establishment of slope model and the prediction of monitoring data in mining area.
关 键 词:矿区边坡 变形监测 时间序列AR(P)模型 预测
分 类 号:P25[天文地球—测绘科学与技术] TD172[矿业工程—矿山地质测量]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26