检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:祁孔忠 QI Kongzhong(China Nuclear Industry 23 Construction Co.,Ltd.,Shenzhen 518120,China)
机构地区:[1]中国核工业二三建设有限公司,广东深圳518120
出 处:《电工技术》2024年第11期223-225,共3页Electric Engineering
摘 要:对福清“华龙一号”首堆下部堆内构件引入、翻转、吊装工艺进行分析。通过对比“华龙一号”堆型与国内已建核电堆型的厂房结构差异和安装工艺,提出下部堆内构件在引入方式、翻转位置确定、翻转区域布置、防侧翻装置安装等技术难点。围绕以上难点,采用对比分析、理论核算、受力计算等方法开展研究,论证了应对措施的合理性和可靠性。This work mainly studies the processes of introduction,flipping,and hoisting of lower internal components of the first reactor of Fuqing"Hualong No.1".By comparing the structural differences and installation processes between the"Hualong No.1"reactor building and existing nuclear power reactors in China,the technical difficulties in introduction method,flipping position determination,flipping area layout,and installation of anti rollover devices of the lower internal components are proposed.Based on the above difficulties,investigation is conducted using methods such as comparative analysis,theoretical accounting,and force calculation to demonstrate the rationality and reliability of corresponding countermeasures.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7