作 者:曾晓 习秋玲 ZENG Xiao;XI Qiuling(State Grid Hubei Electric Power Co.,Ltd.,Wuhan 430000,Hubei,China)
机构地区:[1]国网湖北省电力有限公司,湖北武汉430000
出 处:《工程技术研究》2024年第10期26-28,共3页Engineering and Technological Research
摘 要:基础作为输电线路的重要组成部分,基础方案的制订及实施对于工程造价、建设周期、劳动安全及环保要求具有重要影响。在山地、丘陵地带,机械化施工线路基础一直是个难题,文章结合某特高压交流线路工程(湖北段)山丘地区48基挖孔桩机械化施工,与常规人工挖孔桩施工进行技术及经济对比,旨在为山丘地区特高压线路挖孔桩机械化施工的推广应用提供借鉴。The foundation is an important part of the transmission line,and the formulation and implementation of the foundation plan has an important influence on the engineering cost,construction period,labor safety and environmental protection requirements.In mountainous and hilly areas,mechanized construction of line foundation has always been a difficult problem.This paper combines 48 foundation digging pile mechanized construction in mountainous and hilly areas in a UHV AC line project(Hubei section)to conduct technical and economic comparison with conventional manual digging pile construction,aiming to provide reference for the promotion and application of digging pile mechanized construction in UHV transmission lines in mountainous and hilly areas.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49