摘 要:常泰长江大桥主航道桥6#墩采用超大台阶型钢沉井基础,为解决超大型钢沉井快速定位、精确着床的难题,该沉井定位系统创新采用“锚墩+大抓力锚”相结合的方式,整个定位系统由锚墩、大抓力锚、大直径钢丝绳、液压连续千斤顶及智能张拉控制系统组成,边锚采用大抓力锚,同时应用了大抓力锚防走锚技术和缆绳快速安装技术。The 6#pier of the main channel bridge of Changtai Yangtze River Bridge adopts the super-large stepped steel open caisson foundation.In order to solve the problem of rapid positioning and precise landing of the super-large steel open caisson,the open caisson positioning system innovatively adopts the combination of"anchor pier+high holding power anchor".The whole positioning system is composed of anchor pier,high holding power anchor,large-diameter steel rope,hydraulic continuous jack and intelligent tensioning control system.The side anchor adopts high holding power anchor,and the high holding power anchor anti-moving technology and cable fast installation technology are applied.
关 键 词:常泰长江大桥 钢沉井 定位系统 锚墩 定位方案 创新技术
分 类 号:U443.131[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.198.25